Despite being impossible to access by car, especially during the rainy season, our experts managed to go on-site to assess its natural conditions. In less than one month, we provided the client with a pre-feasibility report including an FGM’s analysis of his land assets.
The client wanted to make sure that the land granted by the local authorities was suitable for large-scale production of soybeans, wheat and corn. The site, located in a very remote area, had never been farmed before and thus had to be studied as a virgin site.
Despite being impossible to access by car, -especially during the rainy season-, our experts managed to go on-site to assess its natural conditions. In less than one month, we provided the client with a pre-feasibility report including an FGM’s analysis of his land assets.
FGM optimized the achievements of the on-site mission by preparing the investigation prior to going on site with:
FGM International findings and recommendations were delivered in a detailed pre-feasibility report including:
Zambia
5 experts
2019
1 Month
10000 ha
Undisclosed